ABOUT THIS PROJECT

The

First Solar Project

with JTC Corporation.

We are one stop clean energy provider.

0 MWp
PV Capacity

0 GWh
of renewable energy generated annually

0
powered HDB 4-room flats

Join one of our innovation platforms.

Terrenus Energy Jurong Pte Ltd​

Terrenus Energy bid a project from Singapore Government agency, JTC Corporation for an installation of solar panels on a 3.9 hectare vacant plot of land on Jurong Island. This project is a 5MW Ground Mount Solar power plant. In 2018, Terrenus Energy has won this project from JTC. Terrenus Energy Jurong is a company under the management of Terrenus Energy Pte Ltd. We focus more on the development of our biggest project that will be operationally ready in 2019. For this project, we will be implementing and installing the first-of-its-kind containerised Solar PV System in Singapore.​

JTC Corporation​

JTC Corporation (JTC) is the lead agency in Singapore to spearhead the planning, promotion and development of dynamic industrial landscape. Over the decades, JTC pioneered cutting-edge industrial infrastructure solutions to meet the evolving needs of companies with each phase of industrialisation. As the industrial infrastructure specialist, JTC has developed over 7000 hectares of industrial land and 4 million square metres of ready-built facilities.

Jurong Island

Jurong Island is the cornerstone of Singapore’s energy and chemicals industry and home to a vibrant portfolio of more than 100 leading global petroleum, petrochemical and specialty chemical companies. Jurong Island is a highly sensitive area, therefore we are honoured to have won the project and was chosen to take the full responsibility in handling this Solar Project from JTC. Knowing that the area is a restricted area, we will definitely take a very close precaution when the project is being carried out.

The Solar Land Programme

Proposal To Design

Build

Own & Operate

A Photovoltaic Power System is located at Plot L8201802039 at Seraya Place, Jurong Island.

Our engineer has created an estimated timeline for the project. We started Initiating (Appointment of consultants) in March 2018. The estimated duration for this stage took a month. After Initiating stage, we proceed with the Planning stage, where the planning of Electrical Design, Site Design are Civil Design were carried out with our consultants. As we need to deal with different companies, the planning stage will take around 3 months to be fully completed. Therefore, the planning process will be from March 2018 to June 2018.

JTC Corporation​

The development of the photovoltaic power system is expected to be completed and fully operational by early 2019. The photovoltaic power system shall be connected to the grid.

The Photovoltaic Power System Operator is expected to propose plans for the photovoltaic power system incorporating the latest technology to minimise environmental pollution, solar glare and other nuisance.

1. SITE CONDITION

2. Connection to Singapore Power Power Grid (SPPG)

3. Photovoltaic Power System Operator’s Key Obligations

- Technical Specifications
Our Layout Plan
- Project Equipment
Materials Used For This Project

INVERTER

MODULE

We are a one stop clean energy provider

We want the whole world to know that there is no disadvantage of using renewable energy.